Foundation Poured for High-Rise Dorm
Georeferenced
Current Georeference
Image Details
Source:
The Valentine
Collection:
Richmond Times-Dispatch Photograph Collection
Date:
7/19/1966
Region:
Richmond, Virginia
(inherited from source)
Description:
Black and white photograph of construction crews working to pour the foundation of a high-rise dormitory being built for RPI (Richmond Professional Institute); the dorm is located on the northeast corner of Franklin and Laurel Streets in Richmond, Virginia; image shows a crane lowering a large cement bucket in to the excavated site; Pace Memorial Methodist Church is visible in the background. Inscription: Stamped __Red date stamp - Jul 20 1966 and black date stamp - Jul 19 1966; black "Property of Richmond Times-Dispatch / News Leader" stamp; black "O'Neil" stamp __Verso Geographic Description: Richmond, Va. --Fan District (Richmond, Va.) --Franklin Street (Richmond, Va.) --Laurel Street (Richmond, Va.)
Source:
Loading...
Rating:
No ratings yet
Georeference Details
By:
John Pole
Date:
Nov 27, 2025
Total:
1 submission
Confidence:
High
Validations:
0
Actions
Timeline
All georeferencing activity and comments for this image
Georeferenced by John Pole Current
Nov 27, 2025 12:21 AM
37.548469, -77.450471
151°
High Confidence
0 validations