Foundation Poured for High-Rise Dorm
Georeferenced
Current Georeference
Image Details
- Source:
- The Valentine
- Collection:
- Richmond Times-Dispatch Photograph Collection
- Date:
- 7/19/1966
- Region:
-
Richmond, Virginia
(inherited from source) - Description:
- Black and white photograph of construction crews working to pour the foundation of a high-rise dormitory being built for RPI (Richmond Professional Institute); the dorm is located on the northeast corner of Franklin and Laurel Streets in Richmond, Virginia; image shows a crane lowering a large cement bucket in to the excavated site; Pace Memorial Methodist Church is visible in the background. Inscription: Stamped __Red date stamp - Jul 20 1966 and black date stamp - Jul 19 1966; black "Property of Richmond Times-Dispatch / News Leader" stamp; black "O'Neil" stamp __Verso Geographic Description: Richmond, Va. --Fan District (Richmond, Va.) --Franklin Street (Richmond, Va.) --Laurel Street (Richmond, Va.)
- Source:
- Loading...
- Rating:
Georeference Details
- By:
- John Pole
- Date:
- Nov 27, 2025
- Total:
- 1 submission
- Confidence:
- High
- Validations:
- 0
Actions
This image has been georeferenced. Login with OpenStreetMap to submit a correction.
Image Subjects
Timeline
All georeferencing activity and comments for this imageGeoreferenced by John Pole Current
Nov 27, 2025 12:21 AM
37.548469, -77.450471
151°
High Confidence
0 validations